Cooley Mesa Road Widening
- Categories:
- Capital Projects/Public Works
- Address:

Project Name: Cooley Mesa Road Widening
Date Started: March 2026
Project location/address: Navajo Road east to the south entrance of Costco.
Project Status: Under construction - Speed limit has slowed to 25mph. Initial work includes clearing and grubbing, waterline installation, and the Alkali Creek culvert extension. As of April 13th, the 3,400' of new waterline and most of the culvert and conduit crossings have been completed. The road platforms will be constructed in preperation for the concrete curb, gutter and Vee Pans.
Projected completion date: Summer 2026
Project Description: Schofield Excavation Inc. is reconstructing Cooley Mesa Road to two through lanes in each direction from Navajo Road east to the south entrance of Costco, connecting the existing four-lane sections on both ends of this corridor. Auxiliary turn lanes for left and right turns will be added at the entrance to Siena Lake. The bus stop at Navajo Road will also be improved. An additional water line is also being added for system resiliency. Paving is scheduled for May 2026.
Construction is expected to take place from Spring 2026 through Summer 2026. Throughout most of the project, two lanes will remain open, with minor traffic shifts and occasional single-lane operations outside of peak traffic hours.